Ch 1: INVESTMENT DECISIONS, PROJECT PLANNING AND CONTROL — V3: 70% Practical Problems & 30% Theory / Standards Rationale
Final
📚 Strategic Financial Management
📖 Ch.1 — INVESTMENT DECISIONS, PROJECT PLANNING AND CONTROL
⚖️ V3: Case Law & Landmark Precedents
⚡ Free Mode (Answers Locked)
⏱ Duration: 90 Mins
🎯 Total Marks: 50
Passed at: 20 Marks
Max Attempts: 10
⚖️ Statutory Applicability: Applicable for ICMAI CMA Final Examinations (December 2026 Attempt - Syllabus 2022)
Exhaustive ICMAI CMA Final Test Series with Step-by-Step Computational Schedules, Case Studies, and Statutory Compliance Tables.
📑 Exam Questions
5 Questions • Total 50 MarksQuestion 1: PRACTICAL COMPUTATION: Advanced multi-scenario on INVESTMENT DECISIONS, PROJECT PLANNING AND CONTROL (Part 1)
10 Marks
📌 Applicable provisions of Income Tax Act Section 32, CAS-10, and Ind AS 16.
Alpha Petrochemicals Ltd., a listed entity in India, is evaluating a capital expansion project involving the installation of a specialized chemical processing unit. The initial outlay comprises Plant and Machinery valued at Rs 500 Lakhs, Installation and Testing charges of Rs 40 Lakhs, and Working Capital requirement of Rs 60 Lakhs. The project life is estimated at 4 years. The company's target capital structure consists of 60% equity and 40% debt. The pre-tax cost of debt is 12% per annum, and the cost of equity is 16% per annum. The applicable corporate tax rate is 25% (plus applicable surcharge and cess, assumed effective at 25% for simplicity). Depreciation on Plant and Machinery is to be charged under the Written Down Value (WDV) method at 15% per annum for Income Tax purposes, and on a Straight Line Method (SLM) over 4 years with a residual value of Rs 20 Lakhs for financial reporting. Salvage value of the plant at the end of Year 4 is estimated at Rs 80 Lakhs.
The projected operational performance before depreciation and taxes (PBDT) is as follows:
| Particulars | Year 1 (Rs Lakhs) | Year 2 (Rs Lakhs) | Year 3 (Rs Lakhs) | Year 4 (Rs Lakhs) |
|---|---|---|---|---|
| Sales Revenue | 300.00 | 450.00 | 600.00 | 500.00 |
| Operating Costs (excl. Dep.) | 100.00 | 150.00 | 200.00 | 180.00 |
Additional Information:
1. Allocated existing overheads of Rs 15 Lakhs per year are included in operating costs, out of which Rs 5 Lakhs are incremental overheads directly attributable to the project.
2. The company incurred Rs 10 Lakhs on a feasibility study last year, which has been capitalized as deferred revenue expenditure.
3. Working capital is fully recoverable at the end of Year 4.
Required:
(a) Compute the Weighted Average Cost of Capital (WACC) for evaluating the project.
(b) Prepare the annual cash flow statements and compute the Net Present Value (NPV), Internal Rate of Return (IRR) approximation, and Modified Internal Rate of Return (MIRR) of the project.
(c) Provide the statutory rationale under relevant Cost Accounting Standards (CAS) and Income Tax Act provisions governing project cash flows.
🔒 Official Model Solution
Model answers and self-evaluation solutions are available in the Premium Tier & Rankers Plan.
Question 2: PRACTICAL COMPUTATION: Advanced multi-scenario on INVESTMENT DECISIONS, PROJECT PLANNING AND CONTROL (Part 2)
10 Marks
📌 Incorporates Ind AS 16, CAS 7, and Income Tax Act Section 32 depreciation rules under effective corporate tax rate 29.12%
AstraZeneca Lifecare Ltd., an established pharmaceutical entity listed in India, is evaluating a strategic capital expenditure proposal to set up an advanced API (Active Pharmaceutical Ingredient) manufacturing facility. The project entails an initial capital outlay of INR 8,500 Lakhs on Plant & Machinery (depreciable under Income Tax Act at 15% on Written Down Value (WDV) and under Companies Act using Straight Line Method over 10 years with a residual value of INR 500 Lakhs) and INR 1,500 Lakhs on Working Capital. The project has an operational lifespan of 5 years.
Additional Financial Data:
- Year 1 to 5 projected annual revenues: INR 6,000 Lakhs, INR 7,500 Lakhs, INR 9,000 Lakhs, INR 8,500 Lakhs, and INR 7,000 Lakhs respectively.
- Cash Operating Expenses (excluding depreciation): 40% of annual revenues.
- Corporate Tax Rate: 25% plus a surcharge of 10% and health & education cess of 4% (Effective Tax Rate = 29.12%).
- Cost of Capital (WACC): 12% per annum.
- Salvage value of Plant & Machinery at the end of Year 5: INR 1,000 Lakhs (taxable at applicable capital gains/depreciation balancing charge rules).
Required:
(a) Prepare the detailed statement of incremental cash flows after tax for the 5-year project horizon.
(b) Compute the Net Present Value (NPV), Internal Rate of Return (IRR), and Modified Internal Rate of Return (MIRR) of the project.
(c) Provide an exhaustive evaluation incorporating relevant Cost Accounting Standards (CAS), Ind AS 16 / Ind AS 36, and Income Tax Act provisions.
🔒 Official Model Solution
Model answers and self-evaluation solutions are available in the Premium Tier & Rankers Plan.
Question 3: PRACTICAL COMPUTATION: Advanced multi-scenario on INVESTMENT DECISIONS, PROJECT PLANNING AND CONTROL (Part 3)
10 Marks
📌 Applicable provisions of Income-tax Act 1961, Ind AS 16, and Cost Accounting Standards CAS-4 & CAS-7.
M/s Vardhaman Synthetics Engineering Limited, a premier manufacturing enterprise listed on Indian bourses, is evaluating a strategic expansion project involving the setup of a specialized heavy-machinery fabrication plant in a backward district. The project requires an initial capital outlay of INR 500 Lakhs towards plant and machinery, and INR 100 Lakhs towards net working capital at t=0. The economic life of the project is estimated at 5 years. The salvage value of plant and machinery at the end of Year 5 is estimated at INR 50 Lakhs. The company follows the straight-line method of depreciation for tax purposes, assuming zero terminal book value for tax depreciation calculation since the block of assets continues to exist (Income-tax Act, 1961). The applicable corporate tax rate is 25% plus a surcharge of 10% and health & education cess of 4%, resulting in an effective tax rate of 29.12%. The company's cost of capital (WACC) is determined at 12% per annum. Additional operational projections: Annual installed capacity is 50,000 units, with expected capacity utilization at 60% in Year 1, 70% in Year 2, 80% in Year 3, 90% in Year 4, and 100% in Year 5. Selling price per unit is INR 2,000 in Year 1, subject to an annual inflation indexation of 5%. Variable cost per unit is INR 1,200 in Year 1, subject to an annual escalation of 6%. Fixed overheads (excluding depreciation) are INR 120 Lakhs in Year 1, escalating by 4% per annum. Furthermore, the project utilizes an existing idle factory shed owned by the company, having a current realizable market value of INR 80 Lakhs (the shed was purchased 5 years ago for INR 60 Lakhs). You are required to compute the Net Present Value (NPV), Internal Rate of Return (IRR), and Modified Internal Rate of Return (MIRR) of the project and provide a comprehensive statutory and cost accounting rationale in accordance with ICMAI standards.
🔒 Official Model Solution
Model answers and self-evaluation solutions are available in the Premium Tier & Rankers Plan.
Question 4: PRACTICAL COMPUTATION: Advanced multi-scenario on INVESTMENT DECISIONS, PROJECT PLANNING AND CONTROL (Part 4)
10 Marks
📌 Applicable provisions of Finance Act, Ind AS 16, Ind AS 7, and Cost Accounting Standards CAS-15
M/s Vardhaman Synthetics Engineering Ltd., an entity listed on Indian stock exchanges and operating in the heavy manufacturing sector, is evaluating a capital modernization and automation project for its advanced fabrication facility. The proposed project involves a total capital outlay of Rs. 200 Lakhs payable upfront at Year 0, comprising Rs. 150 Lakhs for plant and machinery and Rs. 50 Lakhs for specialized tooling and robotics. The economic life of the project is estimated at 4 years with a zero salvage value at the end of Year 4. The company follows the straight-line method of depreciation for financial reporting and Income Tax purposes (assuming 15% depreciation under the Written Down Value method or equivalent SLM as applicable for specific project blocks, but for this problem, assume a flat 25% SLM over 4 years for tax depreciation matching the project life). The corporate tax rate is 25% plus a 10% surcharge and 4% Health and Education Cess, resulting in an effective tax rate of 29.12%.
The projected operational cash flows before depreciation and tax (CFBDT) for the four years are as follows: Year 1: Rs. 85 Lakhs; Year 2: Rs. 95 Lakhs; Year 3: Rs. 110 Lakhs; and Year 4: Rs. 90 Lakhs. The project requires an additional working capital injection of Rs. 20 Lakhs at Year 0, which is fully recovered at the end of Year 4. The company's cost of capital is determined using the Capital Asset Pricing Model (CAPM). The risk-free rate is 7%, the market risk premium is 6%, and the company's equity beta for this asset class is 1.2. The cost of debt is 10% pre-tax, and the capital structure comprises 60% equity and 40% debt. Inflation is expected to be 5% per annum, and all cash flows are stated in nominal terms.
Required:
(a) Compute the Weighted Average Cost of Capital (WACC) for evaluating the project.
(b) Prepare a detailed Statement of Incremental Cash Flows after Tax (CFAT) for each of the 4 years.
(c) Calculate the Net Present Value (NPV), Internal Rate of Return (IRR) to the nearest percentage, and Discounted Payback Period.
(d) Provide an exhaustive evaluation incorporating Indian accounting, tax, and Cost Accounting Standards (CAS) rationale.
🔒 Official Model Solution
Model answers and self-evaluation solutions are available in the Premium Tier & Rankers Plan.
Question 5: PRACTICAL COMPUTATION: Advanced multi-scenario on INVESTMENT DECISIONS, PROJECT PLANNING AND CONTROL (Part 5)
10 Marks
📌 Incorporates Ind AS 16 asset capitalization, CGST Act input tax credit rules, Section 32 Income-tax Act depreciation tax shields, and ICMAI Cost Accounting Standards.
Alpha Engineering Ltd., a listed entity under ICMAI framework, is evaluating a strategic capital expenditure proposal titled 'Project Omega' involving a total initial equipment outlay of INR 500 Lakhs and additional working capital requirement of INR 80 Lakhs. The project life is 4 years. The salvage value at the end of Year 4 is estimated at INR 50 Lakhs (taxable at 25%). Straight-line depreciation is used for tax purposes. The company's tax rate is 25% and its weighted average cost of capital (WACC) is 12%. The operational cash flows before depreciation and taxes (CFBDT) for Years 1 to 4 are projected under two scenarios: Optimistic (Probability 0.40) with CFBDT of INR 220 Lakhs per annum, and Pessimistic (Probability 0.60) with CFBDT of INR 140 Lakhs per annum. Additionally, at Year 2, management has a real option to abandon the project for a net salvage value realization of INR 320 Lakhs (after all tax adjustments). Using Decision Tree Analysis combined with Risk-Adjusted Discounting under the Capital Asset Pricing Model (CAPM) framework where beta of the project under the two scenarios differs, calculate the Expected Net Present Value (ENPV) of the project incorporating the real option, and evaluate strategic implications under Ind AS 16 and relevant Cost Accounting Standards.
🔒 Official Model Solution
Model answers and self-evaluation solutions are available in the Premium Tier & Rankers Plan.
Advertisement