🏠 Home How to use e-mentor 🎁 Earn Gifts by Studying
📚 Study Hub
🤖 AI Study PlannerPAID 🔁 Recap Cards ⚔️ 1v1 Study Duels NEW 📋 Test Series 💎 Test Series PackagesTIERS 🎁 Invite FriendsFREE PLANNER 📖 Track Chapters
⚡ Focus & Tools
🎧 Virtual Focus Room LIVE ⏱ Pomodoro Timer 🏆 Leaderboard 🎁 Earn Gifts by Studying
🌐 Community & Info
✍️ Blog ❓ Frequently Asked Questions ℹ️ Read Me First
Login Join Free
📢 UPDATES
📅 25th All India Debate Competition 2026  |  🏆 Leaderboard resets weekly — Keep your streak alive!  |  💡 Join Discussion Board for exam doubt clearing  |  📅 25th All India Debate Competition 2026  |  🏆 Leaderboard resets weekly — Keep your streak alive!  |  💡 Join Discussion Board for exam doubt clearing  | 

Ch 4: APPLICATION OF OPERATION RESEARCH - PRODUCTION PLANNING AND CONTROL (PAGES 111-282) — Previous Year Exam Questions (PYQ)

Intermediate 📚 Operations Management & Strategic Management 📖 Ch.4 — APPLICATION OF OPERATION RESEARCH - PRODUCTION PLANNING AND CONTROL (PAGES 111-282) ⭐ V1: Previous Year Question (PYQ) ⚡ Free Mode (Answers Locked)
⏱ Duration: 54 Mins 🎯 Total Marks: 30 Passed at: 12 Marks Max Attempts: 10
⚖️ Statutory Applicability: AY 2026-27 & Current Institute Curriculum

Answer ALL questions. Working notes / statutory sections must form part of the answers.

Login to Enroll & Start Join Free

📑 Exam Questions

6 Questions • Total 30 Marks

1(a): Control Measures - Time & Motion Study, Method Study, Work Study

5 Marks
A company manufactures two items X1 and X2. They are sold at a profit of ₹ 30 per unit of X1 and ₹ 20 per unit of X2. X1 requires 2 kgs of materials, 3 man - hours and 1 machine - hour per unit. X2 requires 1 kg of material, 2 man - hours and 3 machine - hours per unit. During each production run there are 280 kgs of material available, 500 labour hours and 420 hours of machines used. Please introduce the slack variables and write down the equations, including the objective function, that will determine the quantity of production of the two items to maximize profits.
🔒 Official Model Solution
Model answers and self-evaluation solutions are available in the Premium Tier & Rankers Plan.
Unlock Answers (₹1,000)

1(b): Production Planning and Control

5 Marks
The following data is available for a machine in a manufacturing unit: Hours worked per day Working days per month Number of operator Standard minutes per unit of production : Machine time Operator time Total time per unit
🔒 Official Model Solution
Model answers and self-evaluation solutions are available in the Premium Tier & Rankers Plan.
Unlock Answers (₹1,000)

2(a): Control Measures - Time & Motion Study, Method Study, Work Study

5 Marks
What are the different modules and their functions in DBMS? (b) Each statement below is either True or False. Indicate the same in your answers: 1 x 3 (i) Cost Benefit analysis is made during the system evaluation phase. (ii) Master file contains the information which are permanent in nature. (iii) The basic aim of normalization is to ensure that the same data are stored in more than one place. (c) In a disk pack, number of tracks in each surface are 200 and number of sectors in each track are 20. If there are 10 Nos. of recording surfaces and 600 bad sectors in the disk pack, calculate total number of good sectors.
🔒 Official Model Solution
Model answers and self-evaluation solutions are available in the Premium Tier & Rankers Plan.
Unlock Answers (₹1,000)

2(b): Control Measures - Time & Motion Study, Method Study, Work Study

5 Marks
📌 No statutory modification required; provision remains active in current study material.
An analyst has observed a job long enough to become familiar with it and has divided it into five elements. The element times for the first four cycles and a performance rating for each element are given in the following table: [1+2+3] Element Cycle Cycle Cycle Cycle Performance Rating ( %) 1.246 1.328 1.298 1.306 0.972 0.895 0.798 0.919 0.914 1.875 1.964 1.972 2.121 2.198 2.146 2.421 1.253 1.175 1.413 2.218
🔒 Official Model Solution
Model answers and self-evaluation solutions are available in the Premium Tier & Rankers Plan.
Unlock Answers (₹1,000)

3(a): Control Measures - Time & Motion Study, Method Study, Work Study

5 Marks
📌 No statutory modification required; provision remains active in current study material.
Name the major heads under which the main types of material handling equipment can be conveniently classified
🔒 Official Model Solution
Model answers and self-evaluation solutions are available in the Premium Tier & Rankers Plan.
Unlock Answers (₹1,000)

3(b): Production Planning and Control

5 Marks
With reference to the statutory framework governing 'Production Planning and Control' under Operations Management And Strategic Management (CMA Intermediate), critically examine the substantive legal provisions, scope, and applicability thresholds. Specifically elucidate: (i) the governing statutory sections/rules/standards; (ii) eligibility conditions, numerical limits, and compliance parameters; and (iii) consequences of non-compliance or procedural default.
🔒 Official Model Solution
Model answers and self-evaluation solutions are available in the Premium Tier & Rankers Plan.
Unlock Answers (₹1,000)
Advertisement

Quick Pomodoro Timer

Select a focus duration to launch your session:

25m Standard 50m Deep Focus 15m Quick Sprint
🎧 Join Virtual Focus Room (with 40Hz Audio) →
🔔
Daily Study Reminders
Get notified 15m before your target study sessions.